No. 953 Precast PC Utility Tunnel Construction Method
(Protection Period: 8 Years)
No. 894 P.P. Storage Tank Construction Method
(Protection Period: 8 Years)
No. 860 Smart MHS
(Protection Period: 12 Years)
No. 834 ISP Rigid-Frame Bridge
(Protection Period: 12 Years)
No. 800 HyFo Beam
(Protection Period: 13 Years)
No. 795 Lightweight Soundproof Tunnel
(Protection Period: 13 Years)
No. 751 Rib-Deck Construction Method
(Protection Period: 15 Years)